How to Install LP SmartSide Lap Siding: Step by Step
LP SmartSide lap siding is an engineered wood product, not vinyl and not fibre cement. It installs like wood, but the clearances, the nailing pattern and the finishing are specific — and most callbacks come from getting one of those three wrong.
What SmartSide actually is
SmartSide is a treated engineered wood strand substrate with a resin-saturated overlay and a factory-applied primer. It cuts and nails like wood, holds paint well, and resists moisture far better than ordinary hardboard — but it is not waterproof. Water that gets behind it has to be able to drain.
Tools and materials
- Circular saw with a 40-tooth carbide blade (or a guillotine for clean cuts)
- 8d hot-dip galvanised or stainless nails, ring shank, 2-3/8 inch
- Starter strip, Z-flashing, house wrap and seam tape
- Caulk rated for exterior siding — polyurethane, not silicone
- 4 ft level, chalk line, spacers
Clearances before you start
| Location | Minimum clearance |
|---|---|
| Above finished grade | 6 inches |
| Below the roof line (roof-to-wall) | 1 inch |
| Above a roof surface | 2 inches |
| Deck or porch surface | 1 inch |
| Window and door heads | Flashing lapped over the top flange |
Step 1: weather barrier and layout
- Install house wrap horizontally, lapping each course over the one below by at least 6 inches, and tape the seams.
- Flash every opening: sill first, then jambs, then head, with the head flashing lapped over the side flashing.
- Snap a level line at the top of the first course, not the bottom. Lap siding sits on a starter strip, so the line controls the whole wall.
Step 2: starter strip
Fix the starter strip at the chalk line, set so the bottom of the first plank overhangs it by 1 to 1-1/2 inches. The starter keeps the first course at the same angle as every other course and stops water tracking behind the bottom edge.
Step 3: first course and nailing
- Set the plank with 1/4 inch clearance at corners and openings.
- Nail 3/8 inch up from the bottom edge, through the single-ply nailing hem — never through the top of the plank.
- 6 inches on centre along the stud line, 8 inches between studs, and always into framing.
- Nail heads must sit flush, not countersunk. An overdriven nail cracks the substrate and creates a water entry point.
- Leave 1/16 inch of play so the plank can move.
Step 4: butt joints
- Joints must land on a stud — never in the field of a bay.
- Leave a 1/8 inch gap between plank ends.
- Behind every butt joint, fit a piece of Z-flashing or a sealed backer so water cannot enter the gap.
- Caulk the joint with a polyurethane exterior caulk after the plank is fixed.
Step 5: laps and coursing
Standard exposure for SmartSide lap is 7 inches on a 12-inch plank, giving a 5-inch headlap. Keep the exposure consistent — varying it is visible from the street. Check every fourth course against your level; a 3 mm drift over ten courses becomes 30 mm at the eave.
Step 6: caulking
- Caulk vertical joints, corners and penetrations.
- Do not caulk the horizontal lap — it is a drainage plane and has to stay open.
- Tool the bead immediately and wipe the excess before it skins.
Step 7: finishing
SmartSide comes factory-primed. Top-coat within 90 days with a 100% acrylic exterior paint, two coats, at the manufacturer’s spread rate. Pay attention to cut ends: brush primer onto every field cut before installation — the factory primer does not cover the cut edge.
Common mistakes
- Nailing high on the plank, which locks the course and causes buckling.
- Overdriving nails — the most common cause of surface cracks.
- No Z-flashing behind butt joints; water enters and the substrate swells.
- Caulking the lap line, which traps water instead of draining it.
- Ignoring the 6-inch grade clearance; splash-back wicks up the plank.
- Cutting with a dull blade, which tears the overlay and opens the edges.
Quick answers
Can SmartSide be installed over existing siding? Only over a flat, sound substrate with a new weather barrier — not directly over textured or failing siding.
What nails should I use? 8d hot-dip galvanised or stainless, ring shank, 2-3/8 inch, into framing.
Does it need painting? Yes. It is factory-primed, not finished; top-coat within 90 days.
Can I butt joints anywhere? No — every butt joint must land on a stud with flashing behind it.